of Position Develop a working knowledge of the site. This should include physical features of the site, such as storm lines, sanitary sewer lines, discharge points, USTs, zoning restrictions, etc. Develop a working knowledge of the sites' permits. The knowledge should include groundwater, surface water, solid waste, and air permits. Perform and coordinate through the site